SERIES 2000 FAULT CODES Power Board Faults

PDF Publication Title:

SERIES 2000 FAULT CODES Power Board Faults ( series-2000-fault-codes-power-board-faults )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 004

2009 Internal Fault GEN IGBT ECM Sensed Generator IGBT Failure System Severity Level 6 This fault is declared when the ECM Control Board senses a malfunction of the Generator IGBT module. Recommended Spare Parts • Battery Charger • ECM Power Board Symptom Probable Cause Analysis Repair Solution Generator IGBT Fault Status indicates fault Ground Wiring Refer to the installation documentation for proper grounding configuration. Correct electrical wiring configuration Shorted Generator Cables Check to see if the generator cable is shorted to ground. Fix problem with the generator cable. Harness connected Verify connection from ECM Control Board (J1) to IGBT is secure and not damaged. Repair/replace IGBT Control Harness Battery Voltage too Low (Stand Alone) 1. Check battery voltage. 2. Refer to the Troubleshooting a MicroTurbine that Does Not Wake Up section to measure the battery voltage. Re-charge the battery pack No DC Bus Voltage From Battery Present (Stand Alone) Verify the DC bus voltage is present. Check battery DC bus connections between ECM and BCM. Correct DC bus problems Shorted Generator Inductors Refer to the Troubleshooting a Micro- Turbine that Does Not Wake Up section. Replace Generator Inductors Generator IGBT Shorted Refer to the Troubleshooting a Micro- Turbine that Does Not Wake Up section. Replace ECM IGBT Module Shorted Generator Remove the generator terminals. Measure resistance from each phase to Ground. It should be greater than 5k Ohms. Replace Engine. Observe Safety Precautions - Refer to Safety Instructions for Details 430013-001 Rev A (October 2002) 30 Model C60 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | SERIES 2000 FAULT CODES Power Board Faults

PDF Search Title:

SERIES 2000 FAULT CODES Power Board Faults

Original File Name Searched:

07_430013_Series 2000.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)