PDF Publication Title:
Text from PDF Page: 022
6026 Internal Warning MP MIN PWR TO MultiPac Minimum Power Timeout System Severity Level 2 This fault is declared when the software detects an insufficient amount of power from a MultiPac to meet the minimum load power demand. Symptom Probable Cause Analysis Repair Solution Not enough MicroTurbines available to load within Minimum Timeout Period Not enough Micro- Turbines available to meet Minimum Power requirements You must have enough MicroTurbine systems to meet the load requirements. Factor in the ambient conditions when matching the MicroTurbine size to load requirements. Install more MicroTurbine systems. Each Model C60 MicroTurbine is considered a 60kW load. Make sure the Minimum Power Setting does not exceed the number of MicroTurbines multiplied by 60kW. For reliability, this setting is a balance between being able to provide adequate power and not require more MicroTurbine systems to start than necessary. Adjust Minimum Power Setting (MINPWR) MicroTurbine Systems are exhibiting faults that prevent starting. A failing MicroTurbine system will reduce the available power and can prevent a MultiPac from reaching the Minimum Power Setting. Troubleshoot codes on fault- ing MicroTurbine system(s) If faults can not be fixed on failing Micro- Turbine systems, consider the possibility of being able to operate with reduced load, or lower Minimum Power Setting. Adjust Minimum Power Setting (MINPWR) Not enough time provided for sequenc- ing MicroTurbine systems to state where they can load. Somewhere between 60 and 120 seconds are required for a Micro- Turbine system to sequence to a state where it is ready to load. Increasing this time will provide higher likelihood for ensuring systems are ready to load. Adjust Minimum Power Timeout Setting (MPWRTO) Observe Safety Precautions - Refer to Safety Instructions for Details 430013-001 Rev A (October 2002) 104 Model C60 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Overview SERIES 6000 FAULT CODES Operational Faults
PDF Search Title:
Overview SERIES 6000 FAULT CODES Operational FaultsOriginal File Name Searched:
11_430013_Series 6000.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)