PDF Publication Title:
Text from PDF Page: 011
3014 Hi-Temp Fault BOARD TEMP HI DPC Control Board Temperature High System Severity Level 3 An environmental temperature range exists for the product that should not be exceeded. This fault is declared when the board temperature reads greater than 79.4 °C (175 °F). Symptom Probable Cause Analysis Repair Solution High Temperature Reading Installed in a hot environment Read specification and verify temperature of airflow to electron- ics is as specified for the product. Provide cooling air at specified temperature. Low power supply voltage Inadequate power supply voltage could cause false readings. Check power supply voltage to be 13.8V. Investigate low power supply voltage problem. (See Fault Code 3019). Debris on DPC Control Board Debris on board temperature thermistor could cause elevated temperatures with leakage current to ground. Clean surface of DPC control board of debris. DPC Heat Sink fans failed Verify heat sink fans are rotating when system is started Replace Heat Sink Fans DPC Vent fan failed Verify vent fan is rotating when system is started Replace Vent Fan Faulty DPC Control Board DPC Control Board may need replacing. Replace DPC Control Board (See Document 513176) Observe Safety Precautions - Refer to Safety Instructions for Details 430001-001 Rev D (June 2003) 4-11 Model C30 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Capstone SERIES 3000 FAULT CODES Sensor Faults
PDF Search Title:
Capstone SERIES 3000 FAULT CODES Sensor FaultsOriginal File Name Searched:
04_3000 Faults.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)