Application Guide Model C30 and C60 HEV Application Information

PDF Publication Title:

Application Guide Model C30 and C60 HEV Application Information ( application-guide-model-c30-and-c60-hev-application-informat )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 025

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Application Guide: C30 and C60 Hybrid Electric Vehicle (HEV) Application Information for Capstone DPC Specifications (Model C30) NOTE An external 12 VDC (-.5/+2.5V) power supply is required. DPC details are presented in the following table. See Appendix B for related drawings. Mean Length Mean Width Mean Height Approximate Weight Air Inlet Volume Air Inlet Temp Heat Rejection 825 mm (32.50 inches) 311 mm (12.25 inches) 464 mm (18.25 inches) 68.5 kg (151 pounds) 217 liters/sec (460 cfm) -20to50°C(-4to122°F) Approximately 2150 watts DPC Details Parameter Data DPC installation requirements are as follows: • The DPC must be mounted and oriented as presented on the relevant detail drawing (provided as a separate document). • Minimum service clearance access must also be provided as outlined on the relevant detail drawing. • DPC installation requires an independent air plenum (do not connect to engine inlet plenum), normally to be drawn from the same source as the engine such as outside ambient air. • Cooling air needs to be clean and dry. • Allowable inlet air temperature: -20 °C to 50 °C (-4 °F to 122 °F). • DPC air inlet temperature must be within two degrees of the engine air inlet temperature. • The DPC must be cooled such that the component temperatures do not exceed specified values. • Maximum static pressure drop from the air inlet to air outlet should be 0.2 inches in water. 480009-001 Rev B (October 2004) Page 25 of 54 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Application Guide Model C30 and C60 HEV Application Information

PDF Search Title:

Application Guide Model C30 and C60 HEV Application Information

Original File Name Searched:

480009_HEV_Application_Guide.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)