Global Microturbine (Global Energy LLC)

Capstone Turbine Parts Listing: Lcm Gcm Igbt Phase 0081088


Capstone Turbine Publications and Parts Suppliers
Parts Listing for Capstone Turbine: C30, C60, C65, C200, C600, C800, and C1000. Capstone APP for Parts and descriptions. Supplier direct information is available in paid app version. Capstone Publications and Patents are also included in app.



Publication Title | Capstone Turbine Parts Listing: Lcm Gcm Igbt Phase 0081088

Capstone Turbine and Capstone Green Energy Parts Listing App for iPhone iPad Search Engine Series

Capstone Turbine and Capstone Green Energy Publications Listing search was updated real-time via Filemaker on:

Capstone Turbine and Capstone Green Energy Publications Listing | Return to Search List

Search Completed | Title | Capstone Turbine Parts Listing: Lcm Gcm Igbt Phase 0081088
Original File Name Searched: lcm-gcm-igbt-phase-0081088.pdf | Google It | Yahoo | Bing


Previous Page | Next Page
capstone-turbine-parts-listing-lcm-gcm-igbt-phase-0081088-001</TD> <TD valign=

Page | 001

510802141-440342A-C200-C1000-LCM-GCM-IGBT-
Download
Phase-Leg-Replacement.pdf
008
LCM/GCM IGBT/Phase Leg Replacement Capstone Model C200
MicroTurbine C1000 Series Work Instructions
This document describes the procedure for replacing one or
more IGBT/phase legs in the Load Control Module (LCM)
(528558-1XX, 528559-1XX) or Generator Control Module (GCM)
(528557-100) on the Capstone C200 MicroTurbine and C1000
Series. The procedure is the same for either module.
Capstone Turbine Corporation • 21211 Nordhoff Street •
Chatsworth • CA 91311 • USA C200/C1000 Series Work
Instructions: LCM/GCM IGBT/Phase Leg Replacement
e. Remove capacitor bank as follows.
(1) Remove and set aside M6X12 screws (8) securing capacitor
bank to IGBT/phase leg heat sinks. See Figure 7.
IGBT/Phase leg heat sink
View Large Image
⚙ ℹ SORT
🔊
FIND

Search Contact: greg@globalmicroturbine.com