PDF Publication Title:
Text from PDF Page: 006
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Application Notes: Fuel Gas Booster Installation Instructions – Model C60 LPNG Fuel Connections Refer to Figure 2 as required. Prepare the fuel system interconnections as follows: 1. The Fuel Gas Booster inlet connection is 1-inch NPT female, and the outlet connection is 3/4-inch NPT female. 2. The High Pressure Fuel Option Kit 507849-100 (required between the Fuel Gas Booster outlet and the Model C60 inlet) has 1/2-inch NPT female connections on either side. The pressure range for this kit is from 103 kPa gauge (15 psig) to 1034 kPa gauge (150 psig). A pressure regulator and gauge is also included with this kit. 3. The Model C60 inlet connection is a –12JIC 37° flared fitting. The Model C60 is equipped with an adapter –12JIC to 3/4-inch NPT female to allow connection to the unit with 3/4-inch pipe. Additionally, a reducer is also supplied (3/4-inch NPT male to 1/2-inch NPT female) to allow the use of 1/2-inch pipe to the Model C60 inlet. CAUTION It is essential to have an adequate supply of gaseous fuel. The fuel supply MUST BE sized to maintain a minimum of at least 1.7 kPa gauge (0.25 psig) under all operating conditions, including start-up requirements. Failure to have a sufficient supply of fuel will result in low inlet pressure Fuel Gas Booster faults. WARNING Always adhere to the Fuel Safety Precautions listed below when performing fuel maintenance operations. Keep flames, cigarettes, pilot lights, and electrical arc-producing equipment, plus all other sources of ignition well away from areas where natural gas fumes are present Keepallsourcesofignitionawayfromareassharingventilation Keep natural gas lines secure, free of leaks, and separated or shielded from all electrical wiring If you smell natural gas: (1) Immediately cease operation of the equipment. (2) Close the fuel isolation valve. (3) Call a qualified professional to locate and repair the source of the leak. 4. NFPA 37 and local codes should be used as a guide for installing the MicroTurbine fuel supply. A separate manual fuel shutoff, external filter, purge valve, and pressure regulator must be installed upstream of the MicroTurbine. The pressure regulator must be sized to avoid flow restriction and set to regulate pressure at the package inlet. 5. The following fuel related items must be installed prior to final commissioning: PipingfromthegassupplytotheMicroTurbine ManualfuelisolationvalvefortheMicroTurbine Mainfuelgasfilterandpressureregulator Purgevalvetoflushoutthegassupplyline 512001-001 Rev C (March 2004) Page 6 of 8 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Fuel Gas Booster Installation Instructions Model C60 MicroTurbine - Low Pressure Natural GasApplication Notes
PDF Search Title:
Fuel Gas Booster Installation Instructions Model C60 MicroTurbine - Low Pressure Natural GasApplication NotesOriginal File Name Searched:
512001_C60_Vertical_FGB_App_Notes.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)