PDF Publication Title:
Text from PDF Page: 054
Capstone Turbine Corporation Model C65 Hybrid UPS User’s Manual 5.6.6. Over Frequency Submenu Utility Input 2/4 Over Frequency 6/7 60.5 Hz 0.16 Sec The Over Frequency submenu shows the system over frequency trip point and associated delay time. If the grid frequency exceeds this over frequency trip point for the set delay time, the system will shut down. The frequency is adjustable from the Under Frequency setting to 65, in 0.1 Hz increments. Initial factory setting is 60.5 Hz. The Over Frequency Delay is the number of seconds allowed for the Over Frequency condition before the system shuts down. This is adjustable from 0 to 10 in 0.01 second increments. Initial factory setting is 0.16 second. This setting can only be changed by a Capstone ASP using CRMS. 5.6.7. Reconnect Delay Submenu Utility Input 2/4 Reconnect DLY 7/7 5.0 Min The Reconnect Delay submenu defines the time that a Hybrid UPS system will continue generating power in Emergency Mode before reconnecting to the utility grid. The turbine checks that the utility grid voltage is within the protective relay settings for this time limit before reconnecting to the grid. It is the minimum amount of time the system will operate in Emergency Mode when the turbine is producing power. Initial factory setting is 5 minutes. The timer can be set from 5 to 30 minutes. NOTE: The Over Frequency submenu is read only, and no settings can be changed using the display panel. Protective relay settings can only be changed by an Authorized Service Provider using CRMS. Page 54 of 71 400027 Rev B (August 2013) Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Capstone MicroTurbine Model C65 Hybrid UPS User's Manual
PDF Search Title:
Capstone MicroTurbine Model C65 Hybrid UPS User's ManualOriginal File Name Searched:
400027B_UM_C65_HYBRID_UPS.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)