C60 2002 User Manual

PDF Publication Title:

C60 2002 User Manual ( c60-2002-user-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 038

Capstone Turbine Corporation MicroTurbine Userís Manual Capstone • Enable MultiPac 11. Go to the System Data top-level menu. 12. Navigate to the System Configuration second-level menu. 13. Navigate to the MultiPac third-level menu. 14. Use the (+) or (-) buttons to select Enable, then press the ACCEPT button. • Reboot the new master unit 15. Go to the System Settings top-level menu. 16. Navigate to the Reboot second-level menu. Use the (+) or (-) buttons to select Yes, then press the ACCEPT button. 17. If there had been a telephone line connected to the modem in the "old" master unit, move the telephone line connection to the modem in the "new" master unit. At this point, the MicroTurbine that had been the original master unit is not part of the MultiPac. To include it in the MultiPac, continue with these steps on its Display Panel. 18. Go to the System Data top-level menu. 19. Navigate to the System Configuration second-level menu. 20. Navigate to the Turbine Number third-level menu. 21. Use the Numeric Keypad to set the Turbine Number to a unique value; then press the ACCEPT button. 22. Navigate to the MultiPac third-level menu. Use the (+) or (-) buttons to select Enable, then press the ACCEPT button. Page 38 of 52 400001-001 Rev A (July 2002) This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | C60 2002 User Manual

PDF Search Title:

C60 2002 User Manual

Original File Name Searched:

400001-Capstone-MicroTurbine-Manual.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)