ADVANCED POWER SERVER (APS) USER’S MANUAL

PDF Publication Title:

ADVANCED POWER SERVER (APS) USER’S MANUAL ( advanced-power-server-aps-users-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 010

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Advanced Power Server (APS): User’s Manual Table 1. APS Display Data Description Utility Connection status of the APS controller (Stand Alone or Grid Connect). Current power meter reading if the use of a meter is selected for the active utility mode. Current power consumption of power meter facility downstream. Will appear blank if the use of a meter is not selected for the active utility mode Power output summation of Group # 2, #3, and #4 (Only viewable in GC mode). Operational Status of turbine Group # 1 to #4. (Can be on or off.) Current power demand of turbine Group # 1 to #4. Current power output of turbine Group # 1 to #4. Display Label Display Data Description Utility Mode Power Meter Flow (Watts) Facility Load (Watts) Group Total Power Output (Watts) Groups 1 to 4 Start Status Groups 1 to 4 Power Demand (Watts) Groups 1 to 4 Power Output (Watts) APS-CRMS Computer Software Program All configuration and control of the APS is achieved through a version of PC software with the name APS-CRMS which is included with the APS product. This software also includes all the functionality of the existing Capstone Remote Monitoring Software (CRMS) product that allows direct communication with Capstone MicroTurbine products. For a description of the software functionality that is not specific to the APS application, refer to CRMS Technical Reference User Edition (410013). APS-CRMS Software Installation This PC software is included on the CD that is inside the APS. The first step prior to installing this software is to choose the computer where the software is to be installed. Confirm the computer meets the minimum requirements that are listed in the Specification section of this document, and connect on the same LAN as the APS. If the APS will not be locally networked, then extra steps must be performed to directly connect a computer to the APS. You will need to reconfigure your computer’s TCP/IP connection settings that are available under the Network Connection Settings menu. First, disconnect any network cables to the computer you are using and directly connect its network connection to the APS LAN port. Once this is done, you can change your computer’s networking TCP/IP settings to use a static IP address and subnet mask as defined below: • IP Address: 198.1.1.1 (can be any number other than the address of the APS) • Subnet Mask: 255.255.0.0 Now you may plug the computer directly into the APS LAN connection port with an Ethernet RJ45 cable. To install this software, simply remove the CD from the APS cabinet and insert in the chosen computer. From the Run directory choose the APS-CRMS_Install.exe icon on the CD to begin installation. Follow the step-by-step instructions to complete the installation. Once the software is installed, launch the APS-CRMS program and enter the IP address of the APS that was provided to Capstone from the customer (this address was programmed into the APS at the factory) into the TCP/IP textbox on the APS (as shown in Figure 5) to allow APS-CRMS PC software to establish communication with the APS. 400011 Rev A (June 2007) Page 10 of 67 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | ADVANCED POWER SERVER (APS) USER’S MANUAL

PDF Search Title:

ADVANCED POWER SERVER (APS) USER’S MANUAL

Original File Name Searched:

400011_APS_Users_Manual.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)