Technical Reference Stand Alone Operation – Capstone Model C30 and C65

PDF Publication Title:

Technical Reference Stand Alone Operation – Capstone Model C30 and C65 ( technical-reference-stand-alone-operation-–-capstone-model-c )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 034

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Stand Alone Operation–Capstone Models C30 and C65 5.4. Sleep Mode The microturbine enters Sleep Mode to conserve battery power during prolonged periods of inactivity. This reduction in battery draw can significantly extend the microturbine battery charge. Sleep Mode inactivity time can be adjusted, and this feature may be configured to activate automatically. NOTE: If the battery isolation switch is set to ON, and the display panel is dark, the system is most likely in Sleep Mode. To manually place the microturbine in sleep mode perform the following: • • 5.5. CRMS: Not Applicable. Display Panel: Pressing the INTERLOCK and DISABLE buttons simultaneously after the microturbine has transitioned to Standby mode also results in system sleep. Starting a Stand Alone System After the BATT START wakes the microturbine, the Stand Alone system may be started. An initial Start command must be received by the microturbine to initiate operation. Ensure that the Stand Alone Interlock has been linked (enabled). • CRMS: From the microturbine control panel, click on the Start button. • Display Panel: Press and hold the INTERLOCK and START buttons simultaneously. The above start command is for a microturbine configured for User dispatch. If the microturbine is configured for Remote dispatch then the Start command must be issued through a contact closure on the Start/Stop digital input. 5.6. Activating Stand Alone Power Output The system transitions to the Load state (output contactor closed) when battery voltage and base battery state-of-charge reaches at least 60 percent. To enable Stand Alone power output, perform the following: • CRMS: From the microturbine control panel, click on the Power ENABLE button. • Display Panel: Press and hold the INTERLOCK and ENABLE buttons simultaneously. This signal can be automated using the Auto Load feature. When Auto Load is enabled, the microturbine automatically issues an Enable command when the system is ready to support the connected loads. 410028 Rev E (June 2013) Page 34 of 42 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Stand Alone Operation – Capstone Model C30 and C65

PDF Search Title:

Technical Reference Stand Alone Operation – Capstone Model C30 and C65

Original File Name Searched:

410028E_TR_C30-C65_STAND_ALONE.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)