Technical Reference Grid Connect Operation – Capstone Model C30 and C65

PDF Publication Title:

Technical Reference Grid Connect Operation – Capstone Model C30 and C65 ( technical-reference-grid-connect-operation-–-capstone-model- )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 016

• Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Grid Connect Operation–Capstone Models C30 and C65 CRMS: From the microturbine control panel menu, select Settings > Load Management Settings, toggle the Reverse Power Protection switch to ON, and then enter a value in the Reverse Power Time field. CRMS Load Management Menu Parameter Description Parameter Value Default Rev Pwr Protection Enables the system to automatically shut down if the power meter registers negative power flow for specified time Disable/Enable Off Reverse Pwr Time Sets the time (in seconds) the microturbine registers a negative power (-PWR) before shutting down 0 to 120 seconds 120 • C30 Display panel: Enter the user password (default is 87712370) and navigate to the Load Management menu. Navigate to the applicable submenu to configure the parameters. C30 Display Panel Load Management Menu Description Value Default Rev Pwr Protect Enables the system to automatically shut down if the power meter registers negative power flow. Also sets the time (in seconds) the microturbine produces power to the utility before shutting down. 0 (Disable)/1 (Enable) 0 to 120 seconds 0 (Disable) 120 3.6. Power Factor Settings (C65 CE only) Many utility companies charge their industrial customers additional fees for reactive power (KVAR) demand resulting from lower power factors. Purchasing equipment to correct the power factor also increases cost. The microturbine power factor settings enable the customer to adjust the microturbine’s power factor to supplement reactive power loads and reduce demand from the utility company, thereby lowering costs. • CRMS: From the microturbine control panel menu, select Settings > Power Factor Settings and configure the power factor. 410027 Rev G (April 2013) Page 16 of 32 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Grid Connect Operation – Capstone Model C30 and C65

PDF Search Title:

Technical Reference Grid Connect Operation – Capstone Model C30 and C65

Original File Name Searched:

410027G_TR_C30-C65_GRID_CONNECT.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)