Technical Reference Grid Connect Operation – Capstone Model C30 and C65

PDF Publication Title:

Technical Reference Grid Connect Operation – Capstone Model C30 and C65 ( technical-reference-grid-connect-operation-–-capstone-model- )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 013

• • Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Grid Connect Operation–Capstone Models C30 and C65 C30 Display panel: Enter the user password (default is 87712370) and navigate to the Load Management menu. Navigate to the applicable submenu to configure the parameters. C65 display panel: not available. C30 Display Panel Time of Use Menu Description Value Default LMTOU Event The LMTOU Event submenu on line two of each submenu displays the event number as 1/20, 2/20, through 20/20, and allows the selection of an event to be configured. 1to20 1 Day of Week < Inactive/Day> Identifies day of week for event execution Inactive = 0 Sunday (1) thru Saturday (7) 0 (Inactive) Time Command Time of day for event to execute Format: HH:MM:SS 00:00:00 to 23:59:00 00:00:00 STOP Check box to start or stop all activity STOP associated with the designated event START Power Demand Power output demand level for the event. Format: no decimals 0 to 2,000,000 kW 0 3.3. Auto Restart Enabling Auto Restart allows the system to automatically attempt a restart after an incident- driven shutdown. If Auto Restart is ON, the system will attempt to restart after most system shutdown modes. This feature may be enabled with any of the listed dispatch modes. Capstone recommends enabling Auto Restart to increase system availability, deliver faster power output and reduce wear on the bearings. If the Auto Restart feature is enabled, the system stores the ON command even through a loss of grid power. Operator intervention may be required to manually restart the system if a high severity fault occurs or a protective relay interval is exceeded. The microturbine must be explicitly commanded ON for automatic operation to be enabled. Enter a value for the Stored Power Demand, which is saved in permanent memory so that it is available to the system on restart. Enter a Restart Delay time to provide the additional time required between start attempts for any connected external devices. • CRMS: From the microturbine control panel menu, select: Settings > Control Settings, and set Auto Restart to ENABLE. Enter a value for the Stored Power Demand. If a time delay is required before restarting the microturbine, enter the delay time in the Auto Restart Delay Grid Connect field. 410027 Rev G (April 2013) Page 13 of 32 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. NOTE: Auto Restart will provide 5 attempts to start the microturbine. After the 5 attempts the unit will be locked out and will require a REBOOT command or power to be cycled. Operator intervention is generally required.

PDF Image | Technical Reference Grid Connect Operation – Capstone Model C30 and C65

PDF Search Title:

Technical Reference Grid Connect Operation – Capstone Model C30 and C65

Original File Name Searched:

410027G_TR_C30-C65_GRID_CONNECT.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)