Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Grid Connect Operation – Capstone Models C30 and C60/C65
Select MultiPac Mode (option)
Configure the MicroTurbine to operate in MultiPac mode to combine output power efficiently to external loads. Refer to the MultiPac Technical Reference (410032) for more details.
• CRMS: From the menu, select Settings > MultiPac Settings, and set the MultiPac Enable setting to ENABLE. Configure the turbine number in the MultiPac system (Master = 1).
• Display panel: Navigate as follows - System Data > System Configuration > MultiPac, and then select ENABLE.
Select Fast Transfer Enable mode (option)
Configure Fast Transfer mode for transition periods when the grid is returns to operation. Normal setting for Fast Transfer operation is Auto. If set to Manual and Auto Restart has been enabled, a manual Start operation must be performed by the user. The Reconnect Delay period determines the amount of time required to verify the grid is in good working condition.
• CRMS: From the menu, select Settings > Control Settings, and set the GC Enable setting to either Auto or Manual. Select the Reconnect Delay time.
• Display panel: Navigate as follows – Grid Connect menu, and then select the GC Enable mode option (Auto/Manual) and the GC Reconnect Delay option (