PDF Publication Title:
Text from PDF Page: 003
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Stand Alone Operation – Capstone Model C30 and C60 Hardware Configuration Contact Terminal Locations The MicroTurbine will not operate in Stand Alone mode if grid power is present on the output terminals (or another voltage source) is connected to any phase. The User Connection Board (UCB) located in the communications bay allows for low- resistance closed-loop circuit connections on 5-volt dry circuit contact terminals. Contact terminal connections are internal to the MicroTurbine, with the exception of external switch contacts, which may be remotely connected to any external device (e.g, PLC or switch): • Battery Wake-up – Provides momentary (0.1 to 2 sec) signal closure to wake-up the battery. Permanent contact closure (>2 sec) WILL COMPLETELY discharge the battery ! (See “Waking a Stand Alone MicroTurbine”) • Stand Alone Interlock – Establishes the Stand Alone mode of operation • External Switch – Enables hardware interlock for remote turbine communication. Software settings must also be established (see “Configuring the Dispatch Modes”) Figures 1 and 2 show the Model C30 and Model C60 contact terminal locations. Figure 1. Stand Alone Contact Terminal Locations (Model C30) 410028-001 Rev. C (July 2004) Page 3 of 22 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. NOTE External Switch Contacts TB1, Pin 3 (AI-1) TB1, Pin 4 (AGND) SA Interlock Contacts TB4, Pin 1 (DI-RTN) TB4, Pin 3 (DI-5) (Momentary only) Battery Wake-up TB2, Pin 7 (Batt Start RTN) TB2, Pin 8 (Batt Start)PDF Image | Stand Alone Operation – Capstone Model C30 and C60
PDF Search Title:
Stand Alone Operation – Capstone Model C30 and C60Original File Name Searched:
stand_alone.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)