PDF Publication Title:
Text from PDF Page: 015
Stand Alone Mode of Operation Troubleshoot the system powered from the battery as follows: 1. Verify Battery Voltage Verify the battery breaker is OFF. Disconnect the battery cable from battery. Attach the DMM probes toPins1&6or3&4onthebatteryconnector(as shown below). 14 25 36 3. Check BCT Contactor Disconnect the BCT Contactor. Use an external 12VDC power supply and check to see if the Contactor is operational. Replace the Contactor (See Document 513157). 4. Check BCT IGBT Repeat Steps #9, #9A and #9B of the Grid Connect System for BCT Power Board. 5. Check UCB Battery Check and verify the 3 VDC lithium battery on the UCB is good. Repair Solution: Replace the battery. 6. Check Low Voltage Power Supply Measure the voltage at modem terminals TB2-4 (+) and TB2-3 (-) on the UCB. It should read 12 to 13.8 VDC. 7. Check Fuses on DPC Power Board Set the DMM to Ohms and measure across each fuse (F1, F2, F500, and F501) on the DPC Power Board. If they do not ring out they are blown. Replace the faulty fuse. LED 6 BCT Power Board BCT Contactor Battery Connector Pin Locations Turn ON the battery breaker and measure the battery voltage. It should read above 200 VDC. If voltage is low, connect an external battery charger and recharge the battery for several hours until the current draw drops below 10 mA. Refer to Service Bulletin SB0023 for details. 2. Check BCT Power Supply Refer to the following figure as required. Check the13.8V indicator (LED 6) on the BCT Power Board on the upper right corner as shown below. If it is not “ON” after a Battery Start command is issued, the problem could be in the BCT Power Board. Replace the BCT Power Board (See Document 513158). Battery Controller Transient (BCT) BCT Inductors BCT Control Board Observe Safety Precautions - Refer to Safety Instructions for Details 430001-001 Rev D (June 2003) 1-15 Model C30 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Capstone Table of Contents ALL Series Fault Codes
PDF Search Title:
Capstone Table of Contents ALL Series Fault CodesOriginal File Name Searched:
C30FaultCodes.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)