Government/Municipal Eastern Municipal Water District

PDF Publication Title:

Government/Municipal Eastern Municipal Water District ( government-municipal-eastern-municipal-water-district )

Next Page View | Return to Search List

Text from PDF Page: 001

Government/Municipal Eastern Municipal Water District The combination of a half-century of steady population growth, a staggering multi-million dollar annual energy bill, and high summer peak energy loads left the Eastern Municipal Water District (EMWD) of Southern California in need of more resources to continue to go with the flow. Enter nine Capstone C60 MicroTurbines® to provide grid-parallel power to the EMWD Operations and Maintenance Center. Located on an expansive 50-acre campus in Perris, California, EMWD has over 600 employees onsite and contains 100,000-square- feet (9,290-square-meters) in administrative offices along with 80,000-square-feet (7,432-square-meters) of maintenance shops. “Annual energy consumption at this one location alone is several million dollars a year,” said Peter Odencrans, the District’s Senior Public Affairs Officer. What began in 1950 as an organization to secure additional water for the then sparsely-populated area of western Riverside County, the EMWD has today swelled into one of the county’s largest water districts. The EMWD encompasses a 542-square-mile (1,400-square- kilometer) service area in a location that has consistently ranked as one of the fastest-growing areas in the United States since 1960. Today, the District manages not only water service, but sewage collection, water desalination, and water recycling. With fewer than 30 average days with any measurable precipitation each year and higher than average California temperatures, the EMWD’s desert-like climate means extremely high summer peak loads. “We try to manage our summer peaks especially, and what’s been very helpful is through these Capstone microturbines we have been At a glance Location Perris, California, USA Commissioned August 2002 Fuel Natural Gas Technologies • Eight 60kW Capstone microturbines in a combined cooling heating and power (CCHP) application. • One 60kW Capstone microturbine operating as a combined heat and power (CHP) unit. • 3,000 MBTU/hr heat exchanger. • 150-ton absorption chiller. • 300-ton evaporation tower. Results • CCHP system power offsets 1/3 of utility use during peak times. • Off-peak, the microturbines produce more power than facility needs. • Microturbine exhaust funneled to absorption chiller cools the 100,000-square-foot (9,290-square-meter) building. • Peak load for the facility is 1,300kW. • Average electrical power demand is 380kW. • Energy costs reduced US$42,000 each month — over half a million US dollars annually. • Projected payback period is 2.5 years.

PDF Image | Government/Municipal Eastern Municipal Water District

PDF Search Title:

Government/Municipal Eastern Municipal Water District

Original File Name Searched:

CS_CAP421_EMWD_lowres.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)