PDF Publication Title:
Text from PDF Page: 077
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Advanced Power Server (APS) 6.8. Group Operational Configuration Each group can have a unique operational configuration that is accomplished by creating a group turbine configuration and a group dispatch operational sequence. The group dispatch operational sequence settings apply to the group (of turbines) as a whole. These settings are stored on the APS or C1000 series controller and allow it to operate the group as a simulated single generator. The group turbine configuration settings are sent to each turbine’s memory by the controller and allow all of the turbines in a single group to operate the same way. These include critical voltage and frequency settings, heat recovery module settings, battery management settings, and dual-mode fast transfer settings. All of these settings must be the same for all units within a group. This eliminates the need to individually configure each turbine in a group directly with the same settings, reducing system setup complexity and setup time. 6.8.1. Configuring Stand Alone and Grid Connect Power Meter Settings CRMS-APS is used to initially set up a power meter for either the Stand Alone or Grid Connect groups. In the Configuration window, highlight Stand Alone Groups or Grid Connect Groups and then select Edit Meter Config from the drop-down list, as shown in Figure 51. This opens the Group Meter Config window, which is used to modify the settings for the power meter. Figure 51 shows the GC Group Meter Config window (for Grid Connect), but the SA Group Meter Config window (for Stand Alone) has the exact same input fields. Details of the input fields are described in Table 9. Figure 51. Edit Meter Configuration Window (Grid Connect Group Selected) 410079 Rev. C (December 2013) Page 77 of 143 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Technical Reference Advanced Power Server (APS)
PDF Search Title:
Technical Reference Advanced Power Server (APS)Original File Name Searched:
410079C_TR_APS-145.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)